New connections and access

[vc_row][vc_column width=”1/3″][vc_column_text]Stephenson Street is currently a blighted and severed site. It is bounded to the north and east by rail infrastructure, to the west by gas holders and by an industrial park to the south.

We will unlock the site, improve connections and access by providing:

  • A link from West Ham Station into a new local centre;
  • Two new pedestrian bridges onto the site increasing permeability from existing communities;
  • A new road bridge / layout to improve traffic flow and ease potential congestion; and
  • Green links that will extend as the project is built out and will be integrated into the Leaway.

We would like to hear your thoughts on the introduction of these new access links in to the site.[/vc_column_text][/vc_column][vc_column width=”2/3″][vc_single_image image=”198″ img_size=”full” alignment=”center”][/vc_column][/vc_row]